Medical Waste Incinerator: Essential Medical Waste Disposal Services Provided By Meda Send

Hazardous wastes are those chemicals and medications that are toxic and infectious which can effectively affect the wellness of the people upon exposed. These may also be laboratory medicines that are used by physicians in aid for harsh and severe Read More …

islands incinerators

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately   Autoclave or microwaves  separately   temperature monitor  attached outside of machine operating  Fuel and electric   –          Toxic and dangerous wastes,   –          Medical pharmaceutical and hospitable liquids  Wastes –          Domestic garbage   –          Electric and electronic wastes –          Industrial wastes –          In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before Read More …

islands incinerators

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately   Autoclave or microwaves  separately   temperature monitor  attached outside of machine operating  Fuel and electric   –          Toxic and dangerous wastes,   –          Medical pharmaceutical and hospitable liquids  Wastes –          Domestic garbage   –          Electric and electronic wastes –          Industrial wastes –          In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before Read More …

new hospital waste treatment plant

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg

new hospital waste treatment plant

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg