Skip to content
Menu

Primary Menu

  • Home
  • Products
  • RFQ
  • Contact
  • Russia
  • Español
  • Français
Search

Incinerator

Waste Incinerators Manufacturer

Home »Posts tagged  study

Tag: study

New Metro incinerator Could cost $1.3 billion more than planned: study

Posted onJune 30, 2021

Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a new study commissioned by waste firm Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than expected. The analysis, conducted Read More …

CategoriesEnglishTagsanalysis, belkorp, bylaw, could, hydro, incinerator, metro, more, new, said, study, than, vancouver, waste

WWW.HICLOVER.COM

HICLOVER INCINERATORS

smart

Recent Posts

  • Установки для сжигания животных (A1200)
  • Incinerador Hiclover | HICLOVER.COM
  • Incinerador Hiclover
  • Клеверные мусоросжигательные заводы (Oṣu Kẹwa 14, Ọdun 2021)
  • Двухкамерный инсинератор – HICLOVER
  • Двойная горелка инсинератора производительностью 50 кг / час
  • Мусоросжигательные заводы – HICLOVER
  • china medical burner
  • Установка для сжигания медицинских отходов
  • Газовый мусоросжигатель (Oṣu Kẹwa 9, Ọdun 2021)
  • Установки для сжигания медицинских отходов
  • د چاپیریال سوځونکی (د مارچ 27، 2023)
  • Environmental Incinerator
  • Установки для сжигания кремации домашних животных (TS30 PLC)
  • Обычное трансферное окно
Copyright © 2023 Incinerator All Rights Reserved.
Catch Adaptive by Catch Themes
Scroll Up
  • Home
  • Products
  • RFQ
  • Contact
  • Russia
  • Español
  • Français